Wax's summer vacation, the only time we can do renovation tasks
Jul. 4th, 2025 11:03 pm![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
It's taken five years to caulk the seam between the two pieces of butcher block on our counter, so I had to dig a bunch of breadcrumbs out of it first with a fruit knife (it's right in front of the toaster). We also re-caulked the seam between the butcher block and the stainless part of the counter by the sink. (The sink is only a few cm from the edge of it, which is very bad design, and the edge of the butcher block there has inevitably suffered and swollen, as the caulk was never going to be adequate; there was no easy way to get the whole counter in stainless, but we should have figured it out anyway. Or alternately, just called up the companies that make tiles and fireplaces out of Finnish soapstone until we found one that would sell us a counter, even though none of them make counters.)
We also oiled the hinge of the bathroom door - the one modern, new door in the house - which has been squeaking for years (unlike all the other doors, which are from 1950 and work flawlessly). And then we glued the aluminum threshold down over the tile floor at that door - it was already loose when the contractors left because the initial adhesive they had used wasn't in contact with the front face of the cement under the tiles, because the tile sticks out a few mm proud of the subfloor. I scraped a layer of gummy glue off the back of the threshold (glue which had never stuck to the tile and instead became impregnated with dust and dirt), then applied some construction adhesive. It's extremely stinky upstairs now as it dries, even with the windows open.
But anyway, all that didn't even take all day. We've done a bunch of laundry and sat on the sofa cuddling cats in between. Can't believe it took us five years.
We also oiled the hinge of the bathroom door - the one modern, new door in the house - which has been squeaking for years (unlike all the other doors, which are from 1950 and work flawlessly). And then we glued the aluminum threshold down over the tile floor at that door - it was already loose when the contractors left because the initial adhesive they had used wasn't in contact with the front face of the cement under the tiles, because the tile sticks out a few mm proud of the subfloor. I scraped a layer of gummy glue off the back of the threshold (glue which had never stuck to the tile and instead became impregnated with dust and dirt), then applied some construction adhesive. It's extremely stinky upstairs now as it dries, even with the windows open.
But anyway, all that didn't even take all day. We've done a bunch of laundry and sat on the sofa cuddling cats in between. Can't believe it took us five years.